This project consists of work associated with Monongahela River Locks and Dam no. 3 (also called Elizabeth Locks and Dams) demolition, establishment of the new navigable channel and stabilization of the monoliths to remain after construction.
This project transformed Coliseum Lake into a stormwater treatment facility for a 362-acre watershed.
The Ft. Eustis Bridge, the entrance to Joint Base Langley-Eustis, was widened during its reconstruction to provide better access.